Call us on 01905 422 533

Luton Sixth Form College

Project Overview

The £56 million redevelopment of Luton Sixth Form College, supported by funding from the Learning and Skills Council (LSC) provides a modern learning environment for 2, 300 students each year. Ce Solutions worked with main contractor VINCI Construction UK to provide several movable walls at the site.

Whilst a number of walls were used to separate classrooms, creating more teaching space, the highlight of Ce Solutions involvement was the design, manufacture and installation of the Impressive 7.2m high Omega Range movable wall to the main theatre hall. This system incorporates an automatic stacking feature and, at this height, is amongst one of the highest movable walls installed in the UK.

Specification

  • 4 No. Omega Range movable wall systems
  • Includes a 14m wide x 7.2m high wall
  • 2 No. Sigma Range sliding folding partitions
  • 45dB sound reduction
  • Oak Melamine finish

Case Studies