Category: Case Studies

  • Fixing sound reverberation problems for the BBC

    Fixing sound reverberation problems for the BBC

    Request a quote Project Overview: The BBC Broadcasting Studios in the Mail Box had numerous ‘outdated’ Acoustic Sound Baffles within 5 of their Radio Broadcasting Studios. Which in turn had been causing sound reverberation problems for many years. They came to Ce Solutions with the issue, looking for a solution that created better acoustic environments…

  • New military concept for Falkland Islands accommodation

    New military concept for Falkland Islands accommodation

    Request a quote Ce Solutions Ltd were honoured to be selected to supply partitions to the Ministry of Defence for their new accommodation development in the Falklands. Not only was this an opportunity to supply our products to a prestigious organisation, it was also a chance to be part of a major military construction project.…

  • BBC DIY SOS Big Build – Grenfell Tower Community Centre

    BBC DIY SOS Big Build – Grenfell Tower Community Centre

    Request a quote Worcester based design and manufacturing company, Ce Solutions, were honoured to be able to volunteer their time, expertise and product to the BBC DIY SOS team to help create a new, purpose-built community centre and boxing gym in Grenfell, London. The new centre is dedicated to the residents whose lives were tragically affected…

  • Rockcliffe Hall – Durham

    Rockcliffe Hall – Durham

    Request a quote Project Overview: Rockliffe Hall Hotel —The only 5 Red Star resort in the North of England, and current home of the English Senior Open. As part of Rockliffe Hall Hotels refurbishment, Ce Solutions were approached to design, supply and fit an Omega Range movable wall system. The architect’s brief was that the…

  • Luton Sixth Form College

    Luton Sixth Form College

    Request a quote Project Overview The £56 million redevelopment of Luton Sixth Form College, supported by funding from the Learning and Skills Council (LSC) provides a modern learning environment for 2, 300 students each year. Ce Solutions worked with main contractor VINCI Construction UK to provide several movable walls at the site. Whilst a number…

  • Alexander Park, Ledbury

    Alexander Park, Ledbury

    Request a quote Project Overview: Alexander Park Golf and Leisure Park is set in 140 acres of stunning parkland in an area of natural beauty. Opened in early 2011, Ce Solutions installed an impressive Omega Movable Wall to the function suite separating the main bar area from the fitness studio. The system covers a 16.3…

  • Marriott Hotel – Birmingham

    Marriott Hotel – Birmingham

    Request a quote Project Overview: The Marriott Hotel is set in the heart of Birmingham city centre. Ce Solutions installed an impressive Sigma sliding folding partition to separate the dining area from the main bar. The panels are complete with integrated magnetic white blinds to provide maximum privacy whilst enjoying there dining experience. Specification 1…

  • Knowle Golf Club

    Knowle Golf Club

    Request a quote Project Overview: Knowle Golf Club had an existing partition that became very difficult to move and offered very little in terms of acoustic performance or feasibility. We installed our Omega Movable Wall to the function suite which now offers revenue to both rooms previously unattainable without a struggle. The inclusion of a…

  • Worcester Warriors

    Worcester Warriors

    Request a quote Project Overview: As part of Worcester Warriors’ new £8 million all-seater stand, Ce Solutions were asked to supply and fit 2 No. Omega Range movable wall systems. The architect was briefed that the design had to support a multi-million pound non rugby business as well as rugby matches themselves. The walls separate…

  • Sedgehill School – Lewisham

    Sedgehill School – Lewisham

    Request a quote Project Overview: As part of the Building Schools for the Future (BSF) scheme, Ce Solutions teamed up with leading contractor Costain and were asked to install 5 No. Omega Range movable wall systems at Sedgehill School. The highlight of which was a 4.5m high curved wall to form a divide for the…