Category: Uncategorised
-
Fixing sound reverberation problems for the BBC
Request a quote Project Overview: The BBC Broadcasting Studios in the Mail Box had numerous ‘outdated’ Acoustic Sound Baffles within 5 of their Radio Broadcasting Studios. Which in turn had been causing sound reverberation problems for many years. They came to Ce Solutions with the issue, looking for a solution that created better acoustic environments…
-
New military concept for Falkland Islands accommodation
Request a quote Ce Solutions Ltd were honoured to be selected to supply partitions to the Ministry of Defence for their new accommodation development in the Falklands. Not only was this an opportunity to supply our products to a prestigious organisation, it was also a chance to be part of a major military construction project.…
-
BBC DIY SOS Big Build – Grenfell Tower Community Centre
Request a quote Worcester based design and manufacturing company, Ce Solutions, were honoured to be able to volunteer their time, expertise and product to the BBC DIY SOS team to help create a new, purpose-built community centre and boxing gym in Grenfell, London. The new centre is dedicated to the residents whose lives were tragically affected…
-
Queen Mary University of London
Request a quote Project Overview: Ce Solutions worked closely with architect Cooch & Associates to produce 2 aesthetically stunning installations of our Sigma Range sliding folding partition system at Queen Mary University of London. The first phase saw us provide flexible conferencing facilities by joining two systems together at a 90⁰ angle when in position…
-
Alexander Park, Ledbury
Request a quote Project Overview: Alexander Park Golf and Leisure Park is set in 140 acres of stunning parkland in an area of natural beauty. Opened in early 2011, Ce Solutions installed an impressive Omega Movable Wall to the function suite separating the main bar area from the fitness studio. The system covers a 16.3…
-
Sedgehill School – Lewisham
Request a quote Project Overview: As part of the Building Schools for the Future (BSF) scheme, Ce Solutions teamed up with leading contractor Costain and were asked to install 5 No. Omega Range movable wall systems at Sedgehill School. The highlight of which was a 4.5m high curved wall to form a divide for the…